DSpace Repository

Diseño de una red de cobre con instalaciones en la red priMaría trabajando en las regletas de repartidor

Show simple item record

dc.contributor.author Matute Solorzano, Ronald Wagner
dc.contributor.author Prieto Granda, Eunixes Abigail
dc.date.accessioned 2014-06-04
dc.date.available 2014-06-04
dc.date.issued 2014-06-04
dc.identifier.uri http://www.dspace.espol.edu.ec/handle/123456789/25474
dc.description El presente trabajo consiste en el “Diseño de una red de cobre con instalaciones en la red primaria trabajando en las regletas de repartidor”, para ello se ha realizado el análisis del uso de la tecnología xDSL en dos empresas de telecomunicaciones que lideran en nuestro país; CNT E.P. cuya cobertura es a nivel nacional, y ETAPA la cual tiene su cobertura completa en la ciudad de Cuenca, aunque cuenta con sucursales en Quito y Guayaquil. En base a la información que hemos podido obtener con las visitas de campo realizadas conjuntamente con el personal técnico de cada empresa a sus respectivos nodos y armarios, hemos podido darnos cuenta que existe una problemática en común, que es el poco cuidado que se tiene en el MDF como por ejemplo: empalmes mal realizados, sin conexión a tierra, la no utilización de fusibles, entre otras. Una vez hecho un análisis en las partes de la red primaria podemos concluir que se puede hacer mejoras considerables en el MDF que es donde se encuentran las regletas del repartidor en las cuales se realizan las cruzadas, es decir la conexión puente entre la entrada de la línea telefónica y el puerto de dato del cliente. es
dc.description.abstract This work is the "Design of a copper network with facilities in the primary network working on strips dealer", for it was made the analysis of using xDSL technology in two leading telecommunication companies in our country; CNT EP whose coverage is nationwide , and ETAPA which has full coverage in the city of Cuenca, but has branches in Quito and Guayaquil. Based on the information we have obtained with field visits together with the technical staff of each company to its respective nodes and cabinets, we have realized that there is a problem in common , which is the little care taken in MDF such as: splices poorly performed , ungrounded , non-use of fuses, among others. Having done an analysis on the parts of the primary system we can conclude that you can make considerable improvements in MDF which is where the strips of the dealer in which the cross is made , ie the bridge connection between input phone line and data port of the client. es
dc.language.iso spa es
dc.rights openAccess
dc.subject RED PRIMARIA es
dc.subject REGLETAS DE REPARTIDOR es
dc.subject XDSL es
dc.subject CNT E.P es
dc.title Diseño de una red de cobre con instalaciones en la red priMaría trabajando en las regletas de repartidor es
dc.type Article es


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search DSpace


Advanced Search

Browse

My Account