Please use this identifier to cite or link to this item: http://www.dspace.espol.edu.ec/handle/123456789/31276
Full metadata record
DC FieldValueLanguage
dc.contributor.authorJurado Paredes, Washington Fabricio-
dc.contributor.authorGomez Cardenas, Andres Giusseppe-
dc.date.accessioned2015-12-06T23:13:21Z-
dc.date.available2015-12-06T23:13:21Z-
dc.date.issued2015-11-
dc.identifier.urihttp://www.dspace.espol.edu.ec/xmlui/handle/123456789/31276-
dc.descriptionEn este informe de materia de graduación se presenta el estudio del Diseño de un Centro de Procesamiento de Datos para la obtención de la certificación TIER VI la cual es una norma especificada en el estándar ICREA para esto se toman en cuenta todos los aspectos del diseño como lo son los diferentes subsistemas que se requieren para el funcionamiento del mismo la dimensión del diseño de un data center es de 600 m2, para este diseño se debieron tomar en consideración varias fases de diseño básico como lo son la Ubicación, la obra civil, el diseño arquitectónico así como también la distribución geométrica del data center (Rectangular 30 X 20 m2) y la distribución de los gabinetes en el mismo. En este estudio se concentra en los cálculos de consumo realizados en cuanto a las cargas eléctricas de las placas del equipamiento de infraestructura se refiere, en estos cálculos incluimos los sistemas de Sistema de climatización, Sistema de video vigilancia, Sistema de control de acceso, Sistema de intrusión y Sistema de control de incendio los cuales son un requerimiento en las etapas de diseño. El objetivo de diseño fue realizar los cálculos detallados para el sistema de energía eléctrica como lo son las todos los sistemas, los UPS, los generadores, el sistema de Bypass, la alta redundancia en equipos y proveedores de servicio eléctrico para obtener eficiencia y estabilidad para que nuestro data center funcione de la manera requerida los cálculos detallados están incluidos en archivos anexos.es_EC
dc.description.abstractIn this report of graduation course we show the design of a data center to obtain the TIER VI certification which is a standard specified in the standard ICREA it comes to all aspects of the design are taken into account as what are the different subsystems required for the operation of the dimension of the design of a data center is 600 m2, for this design were due to consider various stages of basic design such as the location, civil works, the architectural design as well as the geometric distribution of the data center (Rectangular 30 x 20 m2) and distribution cabinets in it. This study focuses on the consumption calculations made in terms of the electric charges of the datasheets of the infrastructure equipment is concerned, these calculations we include the systems of air conditioning system, Video surveillance system, System Access Control System intrusion and fire control system which is a requirement in the design stages. The design goal was to make detailed calculations for the electricity system as are all systems, UPS, generators, Bypass system, high redundancy in equipment and electric service providers for efficiency and stability our data center operate in the manner required detailed calculations are included in attachments.es_EC
dc.language.isospaes_EC
dc.publisherESPOLes_EC
dc.rightsopenAccesses_EC
dc.subjectCentro de Datoses_EC
dc.subjectICREAes_EC
dc.subjectTIER IVes_EC
dc.subjectcálculos sistema eléctricoes_EC
dc.titleDiseño de un Centro de Procesamiento de Datos Tier IV de 600 m2 Elaborando un Sistema Detallado para el Cálculo del Sistema de Eléctrico de Energíaes_EC
dc.typeArticlees_EC
Appears in Collections:Artículos de Tesis de Grado - FIEC

Files in This Item:
File Description SizeFormat 
Resumen de Tesis Jurado_Washington y Gomez_Andres.pdf522.39 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.