Por favor, use este identificador para citar o enlazar este ítem: http://www.dspace.espol.edu.ec/handle/123456789/65904
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.authorRomán Quizhpe, Carlos Alexander-
dc.contributor.authorVeas Sánchez, Erick Joel-
dc.contributor.authorMerchán, Bethy, Director-
dc.date.accessioned2025-05-05T16:22:17Z-
dc.date.available2025-05-05T16:22:17Z-
dc.date.issued2025-04-30-
dc.identifier.citationRomán Quizhpe C.A. y Veas Sánchez E.J. (2024). Diseño del sistema de alcantarillado sanitario de la Zona Especial de Desarrollo Económico del Litoral (ZEDE). [Proyecto Integrador]. Escuela Superior Politécnica dl Litoral.es_EC
dc.identifier.urihttp://www.dspace.espol.edu.ec/handle/123456789/65904-
dc.descriptionLa Zona Especial de Desarrollo Económico (ZEDE) del Litoral está ubicada dentro del Campus de la ESPOL, con 131 ha. Se proyecta una población de 533 personas, de las cuales actualmente hay 108. Sin embargo, el sistema de alcantarillado sanitario (AASS) existente en la ESPOL, es insuficiente para satisfacer las necesidades sanitarias de la ZEDE del Litoral, cuyo único componente de alcantarillado disponible es una planta depuradora (PDAR) que recibe las aguas residuales del edificio Centro de Tecnologías de Información (CTI). En este contexto, el proyecto planteó diseñar el sistema de alcantarillado sanitario (redes de recolección y el sistema depurador), mediante un análisis técnico y con criterios de sostenibilidad, para la prevención de la contaminación por aguas residuales. Las actividades fueron: i) levantamiento y procesamiento de información; ii) análisis de la PDAR existente para su repotenciación; iii) propuesta y valoración de alternativas; iv) diseño del sistema; v) análisis de impacto ambiental, planos, manual de operación y mantenimiento (O&M), presupuesto y especificaciones técnicas. Los resultados muestran 1.63 km de tuberías con diámetros entre Ø100 a Ø200 mm, 35 pozos de inspección y 155 cajas domiciliarias. Para la repotenciación, los 2 tanques de aireación serán unificados (2.5m x 5m x 3.5m) y equipados con 16 difusores de burbuja fina; el clarificador tendrán dos módulos rectangulares (1.5m x 4m x 3.5m), con una bomba de impulsión de 1/4 HP. El digestor de lodos será cilíndrico, con Ø 4.5 m y una altura de 4.5 m, que generará 35 kWh/día de energía por la producción de biogás. El presupuesto referencial es de USD 210.950,72 + IVA. Para hacer frente al aspecto ambiental, se tiene un presupuesto de USD 8.763,21 + IVA para la fase constructiva (CAPEX). Por tanto, el valor total del proyecto en su fase constructiva es de USD 219.713,93 + IVA, mientras que los gastos de O&M es de USD 23.730,46 + IVA por año.es_EC
dc.description.abstractThe Special Economic Development Zone (ZEDE) of Litoral is located within the ESPOL Campus, covering an area of 131 hectares. A population of 533 people is projected, with a current population of 108. However, the existing sanitary sewer system (AASS) at ESPOL is insufficient to meet the sanitary needs of ZEDE Litoral, whose only available sewer component is a treatment plant (PDAR) that receives wastewater from the Information Technology Center (CTI) building. In this context, the project aimed to design the sanitary sewer system (collection networks and the treatment system) through technical analysis and sustainability criteria to prevent wastewater pollution. The activities carried out included: i) data collection and processing; ii) analysis of the existing PDAR for its repowering; iii) proposal and evaluation of alternatives; iv) system design; v) environmental impact analysis, drawings, operation and maintenance (O&M) manual, budget, and technical specifications. The results include 1.63 km of pipelines with diameters ranging from Ø100 to Ø200 mm, 35 inspection wells, and 155 household connection boxes. For the repowering, the two aeration tanks will be unified (2.5m x 5m x 3.5m) and equipped with 16 fine-bubble diffusers; the clarifier will feature two rectangular modules (1.5m x 4m x 3.5m) with a 1/4 HP pumping system. The sludge digester will be cylindrical, with Ø4.5m and a height of 4.5m, generating 35 kWh/day of energy from biogas production. The reference budget is USD 210.950,72 + IVA. To address environmental considerations, a budget of USD 8,763.21 + IVA is allocated for the construction phase (CAPEX). Therefore, the total value of the project during its construction phase is USD 219.713,93 + IVA, while the O&M expenses are USD 23.730,46 + IVA per year. Keywords: treatment plant, innovative industries, ZEDE Litoral, AASSes_EC
dc.language.isoeses_EC
dc.publisherESPOL.FICTes_EC
dc.subjectplanta depuradoraes_EC
dc.subjectindustrias innovadorases_EC
dc.subjectZEDE del Litorales_EC
dc.subjectAASSes_EC
dc.titleDiseño del sistema de alcantarillado sanitario de la Zona Especial de Desarrollo Económico del Litoral (ZEDE).es_EC
dc.typeThesises_EC
dc.identifier.codigoespolT-115190-
dc.identifier.codigoproyectointegradorINGE-2689-
Aparece en las colecciones: Tesis de Ingeniería Civil

Ficheros en este ítem:
Fichero Tamaño Formato  
T-115190 INGE-2689 ROMAN-VEAS.pdf12.87 MBAdobe PDFVisualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.