Please use this identifier to cite or link to this item: http://www.dspace.espol.edu.ec/handle/123456789/3215
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorAlarcón, Rafael, Directores_ES
dc.contributor.authorChico Soto, Elviraes_ES
dc.contributor.authorLindao Colobon, Efraínes_ES
dc.contributor.authorVargas Soto, Juanes_ES
dc.date.accessioned2003-01-05es_ES
dc.date.accessioned2009-03-10-
dc.date.available2003-01-05es_ES
dc.date.available2009-03-10-
dc.date.issued2003-01-05es_ES
dc.identifier.urihttp://www.dspace.espol.edu.ec/handle/123456789/3215-
dc.description.abstractESTE TRABAJO MUESTRA DE MANERA GENERAL LOS SISTEMAS DE CONTROL DE LA CENTRAL TERMOELECTRICA MACHALA POWER EN SU PRIMERA FASE DE CONSTRUCCION. DESCRIBE EL FUNCIONAMIENTO DE LA UNIDAD TURBINA GENERADOR Y LOS SISTEMAS QUE COMPONEN LA PLANTA, ASI COMO LA INSTRUMENTACION UTILIZADA EN LA MISMA. ADEMAS PRESENTA LOS SISTEMAS DE CONTROL IMPLEMENTADOS A PARTIR DE LA TECNOLOGIA DIGITAL. EL BOP (BALANCE OF PLANTA) ES CONTROLADO POR EL SISTEMA SYMPHONY DE ABB Y LAS UNIDADES TURBINA GENERADOR Y SUS SISTEMAS AUXILIARES SON CONTROLADOS POR EL SPEEDTRONIC MARK V DE GENERAL ELECTRIC.es_ES
dc.language.isospaes_ES
dc.rightsopenAccess-
dc.subjectSISTEMAS, TERMOELECTRICA, CONSTRUCCIONes_ES
dc.titleSistemas de control de la central termoeléctrica Machala poweres_ES
dc.typebachelorThesises_ES
Appears in Collections:Tesis de Electricidad

Files in This Item:
File Description SizeFormat 
5734.pdf4.16 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.