dc.contributor.authorPantoja Peralta, Víctor Emmanuel-
dc.contributor.authorMartínez Rojas, Ana Belén-
dc.contributor.authorFalcones Zambrano, Sixto Daniel, Director-
dc.date.accessioned2026-01-22T14:52:06Z-
dc.date.available2026-01-22T14:52:06Z-
dc.date.issued2025-
dc.identifier.citationPantoja Peralta V.E; Martínez Rojas A.B. (2025). Desarrollo de un gemelo digital asociado a una linea de su transmisión de 69 kv para la detección temprana de anomalías [Proyecto de Titulación] Escuela superior Politécnica del Litorales_EC
dc.identifier.urihttp://www.dspace.espol.edu.ec/handle/123456789/67388-
dc.descriptionCONDICIONAMIENTO DE PUBLICACION DE PROYECTOS. Representar digitalmente alg´un aspecto, elemento o par´ametros para su respectivo estudio viene generalmente acompa˜nado de consideraciones que pueden ser: de car´acter mec´anico, estructural, ambiental, dependiente del tiempo, el´ectrico, en base a representaciones matem´atica, etc. Estas consideraciones permiten satisfacer todos los requerimientos planteados, para poder obtener una imitaci´on 1:1 del elemento en cuesti´on (sin olvidar el tremendo esfuerzo computacional para considerar cada par´ametro preestablecido) pese a ello, estas representaciones presentan ciertas limitaciones o zonas de inter´es, las cuales permiten definir el objetivo del estudio, es decir, puede que considerar pr´acticamente todos los fen´omenos involucrados mejore el margen de error, pero al tener limitaciones de dise˜no, computaciones, informaci´on (data hist´orica) se realizan asunciones alineadas al t´opico de estudio y/o representaci´on del sistema. El motivo por el cual se ve necesario realizar un estudio en la l´ınea de subtransmisi´on de 69 kV Puerto Inca-Naranjal, se debe a las interrupciones recurrentes en el sector Naranjal sin causa conocida a pesar del mantenimiento a la red, que afectan a los moradores del sector y a la estabilidad del sistema el´ectrico. Esto motiv´o a implementar un gemelo digital en la l´ınea de subtransmisi´on de Puerto Inca - Naranjal, con el prop´osito de poder analizar su comportamiento bajo diferentes escenarios operativos determinando as´ı las posibles anomal´ıas que afecten al sistema. Esto se determina con la data hist´orica proporcionada por CNEL EP UN Milagro, la cual permiti´o desarrollar todo el diagrama unifilar, mostrando como resultado novedades en el rango de tensi´on operativo en dicha zona (valores menores a 0.95 p.u.). Para contrarrestar esta ca´ıda de tensi´on, se propone siete escenarios de simulaci´on: La implementaci´on de la l´ınea de subtransmisi´on paralela Montero 2 - Puerto Inca, la incorporaci´on de dispositivos FACTS (STATCOM/ SVS) y de bancos capacitores en las barras de Puerto Inca y Naranjal, el an´alisis para cada alternativa implementada con variaci´on de carga, la simulaci´on de retiro de l´ıneas de subtransmisi´on, el ajuste de taps de los transformadores Puerto Inca y Naranjal. De estos escenarios, se determina que al seleccionar la opci´on de STATCOM y banco de capacitores en la barra Naranjal, se proporciona una mejor entrega de nivel de tensi´on en las barras, as´ı como el respectivo control inclusive ante generaci´on fotovoltaica, el cual corresponde al s´eptimo escenario. De los resultados obtenidos de este ´ultimo escenario, se recomienda la aplicaci´on del equipo STATCOM, para perfiles de carga y generaci´on con irradiancia no estacionaria, caso contrario ante la presencia de carga y generaci´on estacionaria, el escenario de banco de capacitores es una opci´on atractiva y funcional para el sistema.es_EC
dc.description.abstractCONDITIONING OF PROJECT PUBLICATION. representing an aspect, element, or parameter for study is generally accompanied by considerations that may be mechanical, structural, environmental, time-dependent, electrical, based on mathematical representations, etc. These considerations allow all the requirements to be met in order to obtain a 1:1 imitation of the element in question (not forgetting the tremendous computational effort required to consider each pre-established parameter). Despite this, these representations have certain limitations or areas of interest, which allow the objective of the study to be defined. In other words, considering practically all the phenomena involved may improve the margin of error, but due to limitations in design, computation, and information (historical data), assumptions are made in line with the topic of study and/or representation of the system. The reason why it is necessary to carry out a study on the 69 kV Puerto Inca-Naranjal subtransmission line is due to recurring interruptions in the Naranjal sector with no known cause, despite maintenance on the network, which affect residents in the sector and the stability of the electrical system. This led to the implementation of a digital twin on the Puerto Inca-Naranjal subtransmission line, with the aim of analyzing its behavior under different operating scenarios, thus determining possible anomalies affecting the system. This is determined using historical data provided by CNEL EP UN Milagro, which enabled the development of the entire single-line diagram, showing as a result new developments in the operating voltage range in that area (values less than 0.95 p.u.). To counteract this voltage drop, seven simulation scenarios are proposed: The implementation of the Montero 2 parallel subtransmission line - Puerto Inca subtransmission line, the incorporation of FACTS (STATCOM/SVS) devices and capacitor banks in the Puerto Inca and Naranjal busbars, the analysis for each alternative implemented with load variation, the simulation of subtransmission line removal, and the adjustment of the Puerto Inca and Naranjal transformer taps. From these scenarios, it is determined that selecting the STATCOM and capacitor bank option at the Naranjal busbar provides better voltage level delivery at the busbars, as well as the respective control, even with photovoltaic generation, which corresponds to the seventh scenario. Based on the results obtained from this last scenario, the application of STATCOM equipment is recommended for load and generation profiles with non-stationary irradiance. Otherwise, in the presence of stationary load and generation, the capacitor bank scenario is an attractive and functional option for the system.es_EC
dc.publisherESPOL.FIECes_EC
dc.subjectDesarrolloes_EC
dc.subjectGemelo digitales_EC
dc.subjectSubtransmisiónes_EC
dc.subjectDetecciónes_EC
dc.subjectAnomalíases_EC
dc.subject69 kves_EC
dc.titleDesarrollo de un gemelo digital asociado a una linea de su transmisión de 69 kv para la detección temprana de anomalíases_EC
dc.typeThesises_EC
dc.identifier.codigoespolT-115510-
dc.identifier.codigoproyectointegradorPOSTG163-
Appears in Collections:Tesis de Maestría en Electricidad

Files in This Item:
File Description SizeFormat 
T-115510 POSTG163 PANTOJA Y MARTINEZ.pdf8.56 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.