Plaza, J. Cárdenas V. (2008). Análisis técnico económico para incrementar la producción del campo parahuacu de petroproducción mediante la técnica del fracturamiento hidráulico: Ingeniero Petróleos. ESPOL. FICT, Guayaquil. 152 p. |
|
dc.identifier.uri |
http://www.dspace.espol.edu.ec/handle/123456789/6246 |
|
dc.description |
Este proyecto presenta un estudio de factibilidad para incrementar la producción del Campo Parahuacu
de Petroproducción mediante la técnica del fracturamiento hidráulico; El campo Parahuacu, fue
descubierto por la Compañía Texaco-Gulf en Octubre de 1968 con la perforación del pozo exploratorio
PRH Nº 1. Este campo cuenta actualmente con ocho pozos de los cuales dos ya han sido fracturados. El
objetivo de este trabajo se basa en determinar la rentabilidad de los pozos que ya han sido fracturados y
seleccionar algún pozo candidato para saber si es conveniente aplicar la técnica del fracturamiento
hidráulico. Este artículo comenzará analizando los parámetros de los tres pozos en estudio y del
yacimiento. Luego de analizados los tres pozos, se realiza el diseño y simulación del fracturamiento y
finalmente se realiza el análisis económico con el fin de determinar si el fracturamiento realizado en los
dos pozos fue rentable para la compañía, en el pozo seleccionado como candidato para fracturar
también se realizó un análisis económico. |
en |
dc.description.abstract |
This project presents a feasibility study to increase the production of the Field Parahuacu of
Petroproducción by means of the technique the hydraulic Fracturing; The field Parahuacu, it was
discovered by the Company Texaco-Gulf in October 1968 with the perforation of the exploratory well
PRH Nº 1. This field has eight wells at the moment which two have already been fractured. The objective
gives this work it is based on determining the profitability it gives the wells that have already been
fractured and to select some well candidate to know if it is convenient to apply the technique of hydraulic
Fracturing. This article will start to analyze the parameters of three wells in study and of the reservoir.
After having analyzed the three wells, we was carried out the design and simulation gives the fracturing
and finally we is carried out the economic analysis with the purpose of determining if the fracturing
carried out in the two wells was profitable for the company, in the selected well as candidate to fracture
was carried out an economic analysis. |
en |
dc.format.extent |
152 Páginas |
|
dc.language.iso |
spa |
en |
dc.publisher |
ESPOL. FICT. |
|
dc.rights |
openAccess |
|
dc.subject |
CAMPO PARAHUACU |
en |
dc.subject |
TÉCNICA DEL FRACTURAMIENTO HIDRÁULICO |
en |
dc.title |
Análisis técnico económico para incrementar la producción del campo Parahuacu de Petroproducción mediante la técnica del fracturamiento hidráulico |
en |
dc.type |
bachelorThesis |
en |
dc.identifier.codigoespol |
D-68325 |
|
dc.identifier.codigoespol |
D-90334 |
|
dc.description.city |
Guayaquil |
|
dc.description.degree |
Ingeniería en Petroleos |
|