Please use this identifier to cite or link to this item: http://www.dspace.espol.edu.ec/handle/123456789/10163
Title: Replanteo y trazado del proyecto vertical de la carretera: cerecita - tamarindo - bajada del progreso: tramo # 1 desde abs. 0+000 hasta abs. 1+100.
Authors: Avilés De La Torre, Henry Wilson
Burgos Lazo, Alexis Benjamin
Maldonado Amaya, Miguel Emilio
Santos, Eduardo
Keywords: TRAZADO
REPLANTEO
SUBRASANTE
SUBBASE
BASE.
Issue Date: 25-May-2010
Abstract: Completed the redesign of the project layout and horizontal, is theRethinking the vertical project, it serves to make the strip clearing with the relevant equipment, then placed side earth-moving spot, and left at subgrade elevation, both made it a good study done by for the movement of soil from the subgrade, getting results would be optimal according to the design Then you can proceed with the redesign of the pavement, thickness, height of subbase, base coat and the coat of the folder track, in which using another type of heavy duty machinery, here you must have a good knowledge of equipment performance and use staking is can begin with the respective signage along the road preventing and regulate the use of the road.
URI: http://www.dspace.espol.edu.ec/handle/123456789/10163
Appears in Collections:Artículos de Tesis de Grado - FICT

Files in This Item:
File Description SizeFormat 
Replanteo y trazado del proyecto vertical de la carretera Cerecita - Tamarindox.pdf355.63 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.